首页> 外文会议>Rapid Excavation and Tunneling Conference >Liner Load Estimation for Soft Ground Pressure Balance TBM Shield Tunnel Projects
【24h】

Liner Load Estimation for Soft Ground Pressure Balance TBM Shield Tunnel Projects

机译:软接地压力平衡TBM盾构隧道项目的衬垫负荷估计

获取原文

摘要

Pressure balance TBM tunneling has advanced to the point where it is routine to essentially match the face and annulus pressures around the TBM envelope. Resulting ground deformations are sensitive to the face pressure-effective stress ratio. The loading on segmental lining is impacted by this, and specifically the degree of pre-convergence, i.e., the relaxation and arching of the ground prior to lining installation. With very little information on the convergence-confinement relationship in pressure-balance TBM situations. This paper addresses the loading on precast segmental lining during pressure balance TBM tunneling based on lining load data from the Northgate Link project.
机译:压力平衡TBM隧道已经前进到了实用的程度,以基本上匹配TBM信封周围的面部和环压力。产生的地变形对面部压力有效应力比敏感。在衬里安装之前,该节段衬里的负荷受到影响,以及预融合的程度,即地面的放松和拱起。关于压力平衡TBM情况下的收敛限制关系的信息很少。本文根据衬里Link项目的衬里载荷数据,解决了压力平衡TBM隧道的预制节段衬里的加载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号