Planning of the San Francisco Public Utilities Commission's Channel Tunnel

机译:旧金山公用事业委员会渠道隧道规划

获取原文

摘要

The proposed Channel Tunnel is a critical component of the San Francisco Public Utilities Commission's Central Bayside System Improvements Project (CBSIP), which is a key element of a $6.9-billion Sewer System Improvement Program to upgrade their aging and seismically vulnerable wastewater facilities. The tunnel will provide gravity conveyance and storage of combined sewage flows from the northeast sector of San Francisco to the Southeast Water Pollution Control Plant for treatment. The tunnel will be approximately 1.7 miles long and 24 feet in internal diameter. It will utilize a single-pass precast concrete segmental lining system. Tunneling challenges include excavating with pressurized face TBM technology through highly variable ground conditions including Franciscan Complex (rock and melange), clayey/silty sands, stiff to hard clay (Old Bay Clay) and mixed-face conditions.
机译:拟议的渠道隧道是旧金山公用事业委员会中央贝旁系统改进项目(CBSIP)的关键组成部分,这是一个6.9亿美元的下水道系统改进计划的关键要素,可升级其老化和地震脆弱的废水设施。隧道将从旧金山东北部门到东南水污染管制厂提供重力运输和储存组合污水流量以进行治疗。隧道将长约1.7英尺长,内径24英尺。它将利用单通过预制混凝土分段衬里系统。隧道挑战包括通过高度可变的地面条件挖掘加压面TBM技术,包括Franciscan Complex(岩石和混合物),粘土/粉质砂,持久地对硬粘土(旧海湾粘土)和混合面条条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号