首页> 外文会议>Rapid Excavation and Tunneling Conference >California High-Speed Rail-Connecting and Transforming California-Design Considerations for Tunnels
【24h】

California High-Speed Rail-Connecting and Transforming California-Design Considerations for Tunnels

机译:加州高速铁路连接和转型加州设计考虑隧道

获取原文

摘要

Construction of the proposed California High-Speed Rail system will require extensive tunneling through mountain ranges in both the north and south regions of the State. Rail alignments under consideration could require between 45 to 50 miles of tunnels that range in length from several thousand feet to over 20 miles under a cover exceeding 2,000 feet at certain locations. Challenging geologic, hydrogeologic and seismic conditions are anticipated along potential tunnel routes. Geologic conditions range from unconsolidated alluvium to strong granitic rocks; tectonically sheared and deformed rock masses; high groundwater pressures and in situ stresses; and active earthquake faults. In addition, the mountain ranges exhibit environmentally sensitive areas that will have to be protected during construction. This paper discusses the design and construction challenges associated with the tunnels in this Statewide system.
机译:建议的加州高速铁路系统的建设将需要通过北部和南部地区的山脉广泛的隧道隧道。正在考虑的轨道对准可能需要45至50英里的隧道,在某些位置超过2,000英尺的盖子下,长度从数千英尺到超过20英里的长度。凭借潜在的隧道途径预期挑战地质,水文地质和地震条件。地质条件范围从未溶解的加剧到强花岗岩岩石;构造剪切和变形的岩体;高地下水压力和原位应力;和主动地震缺陷。此外,山区范围展示了在施工期间必须保护的环境敏感区域。本文讨论了与这种州际系统系统中的隧道相关的设计和施工挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号