BREAKTHROUGH OUTAGE AT THE SECOND MANAPOURI TAILRACE TUNNEL PROJECT, NEW ZEALAND

机译:新西兰第二届马纳普里泰勒斯隧道项目的突破性中断

获取原文

摘要

The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997 and 2002, a second 10m diameter tailrace tunnel was constructed to increase the output and to improve the overall hydraulic efficiency and output of the station. A critical economic and project approval consideration for the second tunnel was the outage time required for the breakthrough into the power station. The power station is in part dedicated to providing power to an aluminum smelter with the balance to the National Grid, and apart from the physical problems associated with providing an alternative power supply to the smelter, the loss of generation revenue and supply risk were significant issues. Innovative planning reduced the planned outage time from several months to 21 days, and the breakthrough was eventually achieved in 11 days as a result of additional value engineering measures implemented during construction. This paper describes the engineering optimization that took place during the planning stages of the project and later during construction, as well as describing the construction methodology used.
机译:Manapouri Power Station是位于新西兰南岛的地下水电站,并于20世纪60年代建造。在1997年至2002年间,建造了第二个10米直径的Tailrace隧道,以增加输出并提高车站的整体液压效率和输出。第二隧道的关键经济和项目批准考虑是突破进入电站所需的停电时间。该电站部分致力于将铝冶炼厂的能力提供给国家电网,除了与为冶炼厂提供替代电源相关的身体问题之外,发电收入和供应风险的损失是重要的问题。创新规划将计划的中断时间从几个月减少到21天,并且由于在建设期间实施的额外价值工程措施而最终会在11天内实现突破。本文介绍了在项目的规划阶段和施工期间进行的工程优化,以及描述所使用的施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号