THE DEVELOPMENT OF THE NEW YORK CROSS HARBOR FREIGHT MOVEMENT PROJECT

机译:纽约交叉港货运项目的发展

获取原文

摘要

The Cross Harbor Freight Movement Project is currently in the Environmental Impact Statement phase. The scheme is addressing alternative solutions to transport freight across the Upper Bay of New York Harbor, from New Jersey through to Brooklyn, Queens and Long Island. Amongst the alternatives being assessed are two tunnel options; from the north shore of Staten Island through to Brooklyn, and from Jersey City to Brooklyn. These tunnels are approximately 30,000 feet in length, and with up to 17,000 feet under the Harbor, would make it one of the longest undersea crossings in the world.. The paper addresses the development of the project, from the Major Investment Study through to the current EIS, and describes the tunnel schemes that are being taken forward. The geological conditions that will be encountered, proposed construction methods, and the ventilation issues associated with such major undersea tunnels will all be described.
机译:Cross Harbor Freight Project项目目前处于环境影响声明阶段。该计划正在解决从新泽西州的上层湾运输货运的替代解决方案,到了Brooklyn,女王和长岛。在评估的替代方案中是两个隧道选项;从史丹岛的北岸到布鲁克林,从泽西城到布鲁克林。这些隧道的长度约为30,000英尺,港口达到17,000英尺,将成为世界上最长的海底交叉口之一。论文解决了该项目的发展,从主要的投资研究到了当前EIS,并描述了向前提出的隧道方案。将遇到,建议的施工方法和与此类主要海底隧道相关的通风问题将进行地质条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号