首页> 外文会议>Rapid Excavation and Tunneling Conference >DESIGN-BUILD OF THE NEW MISSISSIPPI OUTFALL TUNNEL AT I-25 FOR DENVER'S T-REX PROJECT
【24h】

DESIGN-BUILD OF THE NEW MISSISSIPPI OUTFALL TUNNEL AT I-25 FOR DENVER'S T-REX PROJECT

机译:设计 - 在丹佛的T-rex项目的I-25隧道新的密西西比州出口隧道的建设

获取原文

摘要

This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River as well as provides long needed relief from flooding problems in the southeastern portion of the Interstate 25 highway corridor. The Outfall tunnel incorporates a one-pass precast concrete segmented liner to convey storm water under I-25 then under Mississippi Avenue to the river. The Outfall crosses both the existing I-25 as well as the future improvements including under the Light Rail Transit, a new bridge abutment, widened lanes, and new retaining walls. The Outfall also crosses adjacent to several buildings and five bridges, under major traffic and utility intersections, and through difficult geology.
机译:本文概述了运输扩展项目(T-REX)的新密西西比隧道排排污。排队将公路和其他城市排水传染到南普拉特河,并在州际公路走廊东南部的洪水问题中提供了长期所需的救济。排污隧道采用单遍的预制混凝土分段衬垫,以在I-25下传送风暴水,然后在密西西比大道到河流。该排水口交叉于现有的I-25以及未来的改进,包括在轻轨运输下,新的桥梁电梯,加宽的车道和新的挡土墙。排水口还在几个建筑物和五个桥梁附近,在主要的交通和公用事业交叉路口,以及通过困难地质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号