Shifting ground conditions when tunnelling often call for different methods of attacking the tunnel face. In order to overcome problems with local unstable soft ground in a hard rock tunnelling project the Boodex method offers a cost effective alternative. Boodex and variants of it is a combination of two well-known techniques, drilling with Boomer rig using Odex gear. It will give a steel lined hole ready for grouting and the steel pipe has a load bearing capacity that means that a spiling effect is achieved. In this paper the method and some applications will be described with possibilities and limitations.
展开▼