Geothermal monitoring was started in the 1980s, in order to better develop and utilize the geothermal fields. After more than 20 years of continuous improving, the geothermal dynamic monitoring system has been set up in Tianjin. Meanwhile, the Technical criterion monitoring of low-medium geothermal field in Tianjin was compiled in 2006. Aiming at the difficulties with measuring, collecting of cost and monitoring the administration, research and development for intelligent management Net PC system of geothermal wells are carried out. This system can make a real-time monitoring for every developer, raising the ability and the level of geothermal administration to a new level. It is very helpful for scientific planning and management of the geothermal development and utilization in Tianjin.
展开▼