首页> 外文会议>International Conference on Electric Technology and Civil Engineering >Construction methods for cross passage in soft ground tunnels in China
【24h】

Construction methods for cross passage in soft ground tunnels in China

机译:中国软土地带隧道交叉通道的施工方法

获取原文

摘要

In recent years, lots of soft ground tunnels, including metro tunnels and road tunnels, have been constructed in many cities in the east of China. Nearly all tunnels have cross passages between two tubes. In soft ground area, cross passages could be built in many kinds of methods, such as, cut-and-cover, mining methods, and combined method. Mining methods with help of ground improvement include grouting method, deep-mixing, high pressure jet grouting and ground freezing method. This thesis summarizes cross passage construction methods for soft ground conditions in China, in which the most successful and popular one, mining method with ground improved by artificial ground freezing and its risk prevention and safety protection measures, are introduced in detail.
机译:近年来,许多软隧道包括地铁隧道和道路隧道,已经在中国东部的许多城市建造。 几乎所有的隧道都有两个管之间的交叉通道。 在软接地区域,交叉通道可以采用多种方法,如切割和覆盖,采矿方法和组合方法。 采矿方法借助地面改进,包括灌浆方法,深混合,高压喷射灌浆和地面冷冻方法。 本文总结了中国软土地条件的交叉通道施工方法,其中介绍了通过人工冻结的最成功和最受欢迎的挖掘方法及其风险预防和安全保护措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号