Designing Energy Efficiency Assessments that Work--Thiess Australian Mining--Case Study

机译:设计工作效率评估 - 泰塞澳大利亚矿业 - 案例研究

获取原文

摘要

Thiess Pty Ltd's Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty Ltd's total energy use and therefore meant that the Australian Mining business unit is required to conduct energy efficiency assessments and report publicly on the outcomes by December 2008 under the Federal Government's Energy Efficiency Opportunities (EEO) Act. Thiess Pty Ltd has a policy commitment to sustainable development throughout its operations. This includes minimisation of its carbon footprint and the Australian Mining business unit has a strong focus on efficiency in all of its operations. It approached the energy efficiency assessment as an opportunity to further improve and build on its energy efficiency and greenhouse gas reduction focus in the business. As a mine contractor, Thiess faced a number of challenges in designing an assessment process that would be both effective and efficient to deliver. For example, unlike most other companies involved in the Energy Efficiency Opportunities program, the energy use associated with the Australian Mining business unit is not fixed to any single geographic location in Australia. Mining vehicles are moved from site to site according to the specific requirements of mine owners and the timing associated with the commencement and completion of contracts. Thiess departed from a traditional 'site by site' based assessment and designed a 'representative assessment' approach that involved detailed investigation of data across all sites and a focused assessment on a single site. Data and analysis was an essential part of the assessment and indicators at company, mine and site level were essential in identifying opportunities and tracking progress. Forty-six potential energy saving opportunities were identified and four of these are currently being implemented. The projects being implemented are: ?payload management, ?automating mobile lighting equipment, ?plant idle time management, and ?turbo idle downtime. The potential savings from the four major projects that have been identified are approximately 150 800 GJ/annum, equivalent to 10 600 tonnes of CO2-e/annum with a simple payback period of less than two years. Beyond the fuel savings however, there are a number of other benefits from the assessment, including operational efficiency, reduced maintenance costs and even a potential reduction in the number of vehicles required to complete the work. The EEO assessment has significantly increased the importance and urgency of energy efficiency and facilitated the sharing of good practice across all Thiess operations. Not only have four projects been adopted for immediate implementation but a further pipeline of projects is available for future possible implementation. This case study describes: ?how Thiess conducted its assessment including the use of energy data and indicators, ?the opportunities identified that are currently being implemented, and ?the lessons learnt and how other organisations can use these to improve their approach to energy efficiency assessments. This case study is a more comprehensive version of a case study developed for the Commonwealth Department of Resources, Energy and Tourism. The assessment results reported in this case study are drawn from the Thiess Energy Efficiency Opportunities Report 2008.
机译:Thiess Pty Ltd的澳大利亚矿业业务部门在2007/2008财政年度使用7.6 PJ能源。这一代表了85%的Thiess Pty Ltd的总能源使用,因此意味着澳大利亚采矿业务部门需要在2008年12月在联邦政府的能源效率机会(EEO)行为下公开向成果报告的能源效率评估。 。 Thiess Pty Ltd在整个运营方面对可持续发展的政策承诺。这包括最小化其碳足迹,澳大利亚采矿业务部门在其所有运营中强烈关注效率。它将能源效率评估视为进一步改善和建立在业务中的能源效率和温室气体减少重点的机会。作为一个矿山承包商,泰诗面临着一些挑战,在设计评估过程中,这些过程都是有效和有效的交付。例如,与参与能源效率机会计划的大多数其他公司不同,与澳大利亚采矿业务部门相关的能源使用不固定在澳大利亚的任何单一地理位置。采矿车辆根据矿主所有者的具体要求与现场移动到现场,以及与开始和完成合同的时间相关的时间。 Thieess通过基于网站的评估出发了传统的“网站,并设计了”代表性评估“方法,涉及在所有网站上详细调查所有网站的数据以及对单个网站的重点评估。数据和分析是公司评估和指标的重要组成部分,矿山和网站层面在确定机会和跟踪进度方面至关重要。确定了四十六个潜在的节能机会,目前正在实施其中的四个。实施的项目是:?有效载荷管理,?自动化移动照明设备,?工厂空闲时间管理,以及涡轮闲置停机时间。已识别的四个主要项目的潜在节省约为150 800 GJ / Annum,相当于10 600吨CO2-E / ANNUM,简单的投资回收期不到两年。然而,除了节省燃料之外,评估中有许多其他益处,包括运营效率,降低维护成本,甚至可以在完成工作所需的车辆数量的潜在减少。 EEO评估大大提高了能源效率的重要性和紧迫性,并促进了所有Thiess行动中的良好做法。不仅采用了四个项目,可立即执行,但项目的进一步管道可用于未来可能的实施。本案例研究描述了:帖子如何进行其评估,包括使用能源数据和指标,并确定目前正在实施的机会,以及所吸取的经验教训以及其他组织如何利用这些组织可以使用这些问题来提高其能效评估的方法。 。本案例研究是为英联邦资源,能源和旅游业开发的案例研究。在本案研究中报告的评估结果是从2008年的Thiess能效机会报告中汲取的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号