首页> 外文会议>International conference on hydropower;Waterpower >Tazimina Hydroelectric Project: A Case Study in Building a Small Hydroelectic Project in Alaska
【24h】

Tazimina Hydroelectric Project: A Case Study in Building a Small Hydroelectic Project in Alaska

机译:Tazimina水电项目:在阿拉斯加建设小型水电项目的案例研究

获取原文

摘要

A water-rich state like Alaska, filled with roaring rivers, glacier-fed lakes, and coastal regions soaked by maritime climates, offers great hydroelectric potential--if considerable obstacles can be overcome. The Tazimina River Hydroelectric Project, an 824-kW run-of-river project recently constructed in southwest Alaska, illustrates the challenges and successes encountered in developing hydroelectric projects in remote Alaska. The Tazimina project faced obstacles throughout development, from the initial permitting phase through design and construction. The facility sits above a salmon-rich stretch of the Tazimina River, ocated on private lands within a national park and preserve in Alaska. The steps involved in acquiring permits for a new project in such a location took four years to complete. The facility's design also posed problems. Complex site conditons required innovative intake structure and udnerground powerhouse design. The project's remote location, cold-weather environment, and short summer season also made construction challenging.
机译:富含富含咆哮的河流,冰川湖泊和海上气候的沿海地区的水富有的状态提供了良好的水力发电 - 如果可以克服相当大的障碍。 Tazimina River水电项目,这是一家最近在阿拉斯加西南部建造的824千瓦河流项目,说明了在远程阿拉斯加发展水力发电项目遇到的挑战和成功。 Tazimina项目面临整个开发的障碍,通过设计和施工来从最初的允许阶段。该设施坐落于富含鲑鱼河的鲑鱼延伸,在国家公园内的私人土地上被发现,并在阿拉斯加保留。在这样一个地点获取新项目许可证中所涉及的步骤花了四年的时间才能完成。设施的设计也提出了问题。复杂的网站条件需要创新的进气结构和Udnerground Powerhoune设计。该项目的偏远地点,冷天气环境和短夏季也取得了施工挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号