首页> 外文会议>International oil gas conference and exhibition in China >A New Method for Evaluating Layer Productivity Using a Permanent Monitoring System
【24h】

A New Method for Evaluating Layer Productivity Using a Permanent Monitoring System

机译:一种使用永久监控系统评估层生产率的新方法

获取原文

摘要

A new method is presented for layer evaluation in pumping wells based on the inflow-performance relationship (IPR) determination for each layer contributing to the well production. Both the theory and field examples of the application are explained. The fundamental principle of the method is the IPR determination for each layer that is contributing to the well production. A permanent monitoring system consisting of a permanent gauge and a shut-in valve is installed in the well to discriminate the flow rate from each layercorresponding to a given stabilied formation dynamic presusre. The method is inherently qualitycontrolled: both rate and transient pressure are continuously monitored at the surface during the test to assure stabilized conditions for a valid IPR.
机译:基于对良好生产的每层的流入性能关系(IPR)确定泵送井的层评估,提出了一种新方法。 解释了申请的理论和现场示例。 该方法的基本原理是对良好生产有助于良好生产的每层的IPR确定。 在井中安装了由永久压力表和关闭阀组成的永久监测系统,以区分每个对应的对应的稳定地层动态预测的流量。 该方法本质上是质量的:在测试期间在表面上连续监测速率和瞬态压力,以确保有效的IPR的稳定条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号