首页> 外文会议>International oil gas conference and exhibition in China;IOGCEC >A New Method for Evaluating Layer Productivity Using a Permanent Monitoring System
【24h】

A New Method for Evaluating Layer Productivity Using a Permanent Monitoring System

机译:一种使用永久监控系统评估图层生产率的新方法

获取原文

摘要

A new method is presented for layer evaluation in pumping wells based on the inflow-performance relationship (IPR) determination for each layer contributing to the well production. Both the theory and field examples of the application are explained. The fundamental principle of the method is the IPR determination for each layer that is contributing to the well production. A permanent monitoring system consisting of a permanent gauge and a shut-in valve is installed in the well to discriminate the flow rate from each layercorresponding to a given stabilied formation dynamic presusre. The method is inherently qualitycontrolled: both rate and transient pressure are continuously monitored at the surface during the test to assure stabilized conditions for a valid IPR.
机译:提出了一种新的方法,该方法基于对有助于该井生产的每一层的流入-性能关系(IPR)确定,来确定抽水井中的层。解释了该应用程序的理论和现场示例。该方法的基本原理是确定有助于油井生产的每一层的IPR。永久监测系统由永久压力表和截止阀组成,该监测系统安装在井中,以区分来自每个层的流速,与给定的稳定地层动态推定值相对应。该方法本质上是质量控制的:在测试过程中,在表面连续监测速率和瞬态压力,以确保有效IPR的稳定条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号