MAN Diesel & Turbo SE was asked by VW Kraftwerk GmbH to build a combined heat and power (CHP) plant on the Volkswagen site in Brunswick. The modern and highly efficient 20V35/44G gas engine was installed, with an output capacity of 10.4 MWe and 9.15 MWth. In this special configuration the plant achieves a net overall efficiency of 84.3%. The request included engineering and planning services, together with genset delivery and various mechanical and electrical components. Furthermore, the client required the plant to be assembled and made ready for use. The project was a huge challenge. Besides having to respect strict noise and emission limits in line with the TA-Luft regulation and meeting common European standards, there were also special re-quirements in terms of the construction. As a result of its location within the Volkswagen production site, the plant had to be constructed in a very confined space. One part of the plant was installed in an existing building, while another part was housed in a new building, which was to be constructed by the client. The main components for the extraction of heat from waste gas were installed in the existing boiler house, within its sub-basement that had a height of 2.3 metres, while the motor itself, together with the systems for the extraction of heat from the engine coolant water and for the waste gas treatment, were housed in a new three-storey building next door.
机译:Man Diesel&Turbo SE被VW Kraftwerk GmbH询问,在布伦瑞克的大众网站上建立一个综合的热量和电力(CHP)植物。安装了现代和高效的20V35 / 44G燃气发动机,输出容量为10.4 MWE和9.15兆瓦。在这种特殊配置中,该工厂达到了84.3%的净总效率。该请求包括工程和规划服务,以及发电机组交付和各种机械和电气部件。此外,客户需要将工厂组装并准备使用。该项目是一个巨大的挑战。除了是否必须尊重严格的噪声和排放限制,符合TA-LUFET规范和满足常见的欧洲标准,还就建设而言也有特殊的重新询问。由于其位置在大众汽车生产现场,该工厂必须在非常狭窄的空间内构建。该工厂的一部分安装在现有建筑中,而另一部分被居住在一个新的建筑物中,该建筑物将由客户构建。从废气中提取热量的主要成分安装在现有的锅炉房屋内,其底部地下室,高度为2.3米,同时电动机本身与系统一起提取来自发动机冷却剂的系统水和废气处理,被安置在隔壁的新三层大楼。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号