首页> 外文会议>IFIP WG 5.1 International Conference on Product Lifecycle Management >Addressing Obsolescence from Day One in the Conceptual Phase of Complex Systems as a Design Constraint
【24h】

Addressing Obsolescence from Day One in the Conceptual Phase of Complex Systems as a Design Constraint

机译:作为设计约束的复杂系统概念阶段中的一天从第一天开始解决过时

获取原文

摘要

Obsolescence issues are one of the main costs in the life-cycle of sustainment-dominated systems, those that require support for many decades. Obsolescence not only occurs when a system element becomes no longer available due to manufacturing updates or production interruption. It also includes the deterioration of the system or component capacity to operate as intended, since it is no longer suitable to fulfil its function, even if it still operates and can be manufactured and supported. As such, it also impacts on the "-ilities" (reliability, functionality, etc. ...) which can be even traced to legislation changes, for instance, the anti-pollution legislation updates for automotive. Obsolescence has so far been mainly addressed from a reactive point of view. Around 70% of the total product cost is committed as a result of decisions in the early design stages. Late changes induce delays in the life-cycle plan and large increases in cost due to re-design and rework. Knowing the impact of the conceptual design phase on life-cycle cost, this paper intends to present a model-based systems engineering approach to proactively assess obsolescence risks. The approach uses obsolescence considerations as constraints during the early design phases, to allow the identification of components potentially at risk of obsolescence. Presenting designers with this information allows them to improve the design, by making it robust and resilient, or to accept the risk and develop an obsolescence mitigation plan. It will be illustrated with an example from the automotive industry.
机译:过时的问题是维持主导的系统生命周期的主要成本之一,需要多十年来支持的人。由于制造更新或生产中断,当系统元素变得不再可用时,不仅发生了过时。它还包括根据预期操作的系统或部件容量的劣化,因为它不再适合满足其功能,即使它仍然运行并且可以制造和支撑。因此,它也会影响“” - “(可靠性,功能等......),这甚至可以追溯到立法变更,例如汽车的反污染立法更新。到目前为止,过时主要来自反应性的观点。由于早期设计阶段的决定,大约70%的产品成本均致力于犯下。由于重新设计和返工,延迟变更诱导生命周期计划中的延误和大幅增加成本。了解概念设计阶段对生命周期成本的影响,本文旨在提出基于模型的系统工程方法,以积极评估过时风险。该方法在早期设计阶段使用过时的考虑因素作为约束,以允许识别可能发生过时的风险。通过这些信息展示设计人员可以通过使其稳健和有弹性,或接受风险并开发过时缓解计划来改善设计。将用汽车行业的示例说明它。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号