Controlled Switching of Unloaded Power transformer- Colcabamba Case with 500/230/33 kV Auto Transfomer

机译:卸载电源变压器的控制切换 - 用500/230/33 kV自动变压器 - 电池开启仪器

获取原文

摘要

This paper presents the application of a controlled switching system for energizing a 500/230/33 kV auto transformer with delta connected tertiary winding in Colcabamba substation, Peru. Controlled switching is used to reduce grid voltage drop during no load energization of power transformer due to high inrush current during its charging; specifically, controlled deenergization to lock residual flux at lowest possible level followed by controlled energization considering residual flux to achieve inrush current mitigation. A verified simple and easily applicable approach to estimate residual flux in individual phases based on inrush peaks obtained during first time energization of power transformers is used to further reduce inrush current to best possible levels.
机译:本文介绍了一个受控开关系统的应用,用于在Colcabamba变电站,秘鲁在Colcabamba变电站中使用Delta连接的第三段绕组。受控切换用于减少由于其充电过程中的高浪涌电流而在电力变压器的负载通电期间减少电网电压下降;具体地,受控的切割以在最低可能的水平下锁定残留磁通,然后考虑剩余通量来实现浪涌电流减轻的受控电流。一种验证的简单且易于适用的方法来估计基于电力变压器的第一次通电期间获得的浪涌峰值的单个相中的残差源用于进一步将浪涌电流降低到最佳水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号