Research about Effect of Defects of Filled Layer in Inverted Arch on the Deep-Buried and Heavy-Haul Railway Tunnel Structures and Its Reinforcement Measures

机译:倒拱式填充层缺陷对深埋重载铁路隧道结构的影响及加固措施研究

获取原文
获取原文并翻译 | 示例

摘要

The existence of the defects of filled layer in inverted arch leads to a more complicated stress state of the deep-buried and heavy-haul railway tunnel structures, which can easily cause the structural cracking and directly affect the safety of the tunnel structures. Based on deep-buried and heavy-haul railway Wuyanhe Tunnel in South Central Shanxi, the numerical simulation is used to analyze the effect of the defects of filled layer in inverted arch on the lining structure and the effect of anchor pile in inverted arch for this filling defect. The results show that: (1) The main stress of the filling layer is mainly controlled by the dynamic load of the train and the ground load has small impact on the filling layer. But when the second lining failure occurs, the filling layer begins to bear the ground load and may be destroyed. (2) The structural damage of the filling layer is not controlled by the dynamic displacement but the tensile break. (3) It is feasible to adopt the method of anchor pile reinforcement to reduce the stress level of the second lining and filling layer. The research results have some reference value for the design and disposal defect of deep-buried and heavy-haul railway tunnel in the future.
机译:倒拱中填充层缺陷的存在,导致深埋重载铁路隧道结构应力状态更加复杂,容易引起结构开裂,直接影响隧道结构的安全。以晋中南部深埋重载铁路乌沿河隧道为例,通过数值模拟分析了倒拱填充层缺陷对衬砌结构的影响以及锚桩在倒拱中的作用。填充缺陷。结果表明:(1)填充层的主应力主要受列车的动载荷控制,地面载荷对填充层的影响较小。但是,当第二次衬砌失效时,填充层开始承受地面载荷,并可能被破坏。 (2)填充层的结构破坏不是由动态位移控制,而是由拉伸断裂控制。 (3)采用锚固桩加固的方法来减小第二层衬砌和填充层的应力水平是可行的。研究成果对今后深埋重载铁路隧道的设计和处置缺陷具有一定的参考价值。

著录项

  • 来源
    《》|2016年|545-552|共8页
  • 会议地点 Beijing(CN)
  • 作者单位

    Southwest Jiaotong Univ., Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, Sichuan 610031, China;

    Civil Engineering Dept., Southwest Jiaotong Univ., Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, Sichuan, China;

    Civil Engineering Dept., Southwest Jiaotong Univ., Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, Sichuan, China;

    Civil Engineering Dept., Southwest Jiaotong Univ., Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, Sichuan, China;

    Civil Engineering Dept., Southwest Jiaotong Univ., Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Chengdu, Sichuan, China;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    heavy haul railway; dynamic stress; defects of filled layer; anchor pile reinforcement;

    机译:重型铁路动应力填充层的缺陷;锚桩加固;