首页> 外文会议>International Conference on Multimedia Systems and Signal Processing >Just-in-Time Material Replenishment Scheduling in a Mixed-Model Assembly Line
【24h】

Just-in-Time Material Replenishment Scheduling in a Mixed-Model Assembly Line

机译:混合模型装配线中的即时材料补充调度

获取原文

摘要

This paper investigated the just-in-time material replenishment problem in a mixed-model assembly line. Given the limited vehicle capacities and no stock-outs constraint, an integer programming model was established to minimize the maximum surplus stock of each item of a work center over all tours. To tackle this complex combinatorial optimization problem, an improved artificial bee colony metaheuristic was introduced by applying a novel neighbor search technique based on the critical path method concept. Finally, simulation experiments were carried out and the results demonstrate that the modified metaheuristic is feasible and effective.
机译:本文调查了混合模型装配线中的即时材料补充问题。鉴于车辆容量有限,没有库存限制,建立了整数编程模型,以最大限度地减少所有旅游工作中心每个项目的最大剩余库存。为了解决这种复杂的组合优化问题,通过基于临界路径方法概念应用新颖的邻近搜索技术来引入改进的人造群菌膜殖民地。最后,进行了模拟实验,结果表明,改性的成分型是可行和有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号