首页> 外文会议>International Conference on Innovative Manufacturing Engineering >Application of Tree Graph Method for Reducing the Total Time of Tool Changing in Milling and Boring Machine Tools
【24h】

Application of Tree Graph Method for Reducing the Total Time of Tool Changing in Milling and Boring Machine Tools

机译:树木图方法在铣床和镗床工具中改变工具总时间的应用

获取原文

摘要

With a view of increasing the productivity on CNC machine tools one of the main solution is to reduce, as much as possible, the auxiliary time consumed with the set-up and replacement of the tools and work pieces engaged in the machining process. Reducing the total time of the tool changing process by the automatic tool changer system can be also achieved through minimizing the number of movements needed for the actual exchange of the tool, from the tool magazine to the machine spindle (the optimization of the tool changing sequences). This paper presents a new design method based on the tree-graph theory. We consider an existing automatic tool changing system, mounted on the milling and boring machining centre, and by applying the new method we obtain all the possible configurations to minimize the tool changing sequence of the automatic tool changer system. By making use of the method proposed we obtain the tool changing sequences with minimum necessary movements needed to exchange the tool. Reconfiguring an existing machine tool provided with an automatic tool changer system by making use of the proposed method leads to obtaining the smallest changing time and thus high productivity.
机译:随着CNC机床上的生产率提高了主要解决方案之一的主要解决方案是尽可能地减少辅助时间,并替换工具和工件从事加工过程的工具。通过最大限度地减少工具实际交换所需的运动次数,减少自动工具更换过程的工具更换过程的总时间,从工具刀库到机械主轴(刀具改变序列的优化),还可以实现)。本文介绍了一种基于树图理论的新设计方法。我们考虑了一个现有的自动换刀系统,安装在铣削和镗孔加工中心上,并通过应用新方法我们获得所有可能的配置,以最大限度地减少自动换刀系统的刀具更换序列。通过使用该方法,我们可以获得更换序列的刀具,以便更换工具所需的最小运动。通过利用所提出的方法来重新配置具有自动工具更换器系统的现有机床,导致获得最小的变化时间,从而高生产率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号