首页> 外文会议>IAHR World Congress >MANAGING FLOOD RISK IN COASTAL CITIES THROUGH AN INTEGRATED MODELLING FRAMEWORK SUPPORTING STAKEHOLDERS' INVOLVEMENT: THE CASE OF RETHYMNO, CRETE
【24h】

MANAGING FLOOD RISK IN COASTAL CITIES THROUGH AN INTEGRATED MODELLING FRAMEWORK SUPPORTING STAKEHOLDERS' INVOLVEMENT: THE CASE OF RETHYMNO, CRETE

机译:通过综合建模框架管理沿海城市的洪水风险,支持利益相关者参与:克里特岛的rethymno的情况

获取原文

摘要

Coastal communities are increasingly at risk from coastal hazards such as floods. Extreme hydro-meteorological events related to sea level rise, storm surges, heavy precipitation, shoreline erosion are driven by climate variability and increase the exposure of people, livelihoods, environmental services, resources and infrastructure to hazard. Flood risk management, which aims to reduce the likelihood and/or the impacts of floods, is considered inevitable. Rethymno city in Crete is one of the case study areas that PEARL project, an EU funded research project - to be completed by 2017, will develop and apply a holistic risk reduction framework that will include multi-stressor risk assessment and risk cascading while strengthening risk governance by supporting the participation of key actors. The development of a multi-scale integrated modelling framework will enable the simulation of extreme event scenarios and multiple stressors covering the whole domain from the Mediterranean Sea all the way up to hydrological boundaries of Rethymo's river basins. The integrated modelling framework, briefly outlined in this paper, will include the estimation of atmospheric variables and the use of climate change scenarios, the estimation of wave characteristic based on a four level downscaling approach, the modelling of near shore response to hurricane impacts and storms e.g. storm surges, wave propagation, sediment transport, erosion, wave diffraction and refraction, as well as catchment hydrological and urban flood modelling. The socio-economic dimension of Rethymno's urban system as a risk evolution factor will be also investigated through the application of Agent Based Models and Cellular Automata techniques. The developed scenarios will take into account local conditions and flood problems as well as stakeholders' perspective, needs and ambitions. Stakeholders' involvement and their engagement with the integrated modelling framework and its outcomes will assist the development of an actionable roadmap for flood risk management for Rethymno.
机译:沿海危险等沿海灾害等沿海危险的风险越来越受到洪水。极端水力气象学事件与海平面上升,风暴浪涌,重度降水,海岸线侵蚀受到气候变异的推动,增加人民,生计,环境服务,资源和基础设施对危害的影响。洪水风险管理,旨在减少洪水可能性和/或洪水的影响,被认为是不可避免的。克里特省的罗希姆诺市是珍珠项目,欧盟资助的研究项目的案例研究领域是2017年完成的,将制定和应用全面的风险减少框架,包括多重压力乐队风险评估和风险级联,同时加强风险通过支持关键行动者的参与来治理。多尺度集成建模框架的开发将使极端事件场景和多个压力探测覆盖来自地中海的整个领域的全部域一直到雷赛姆河流域的水文界限。本文简要概述的集成建模框架将包括大气变量和气候变化方案的使用,基于四级缩小方法的波特征估计,靠近岸边反应对飓风影响和风暴的建模例如风暴浪涌,波传播,沉积物运输,侵蚀,波衍射和折射,以及集水区水文和城市洪水建模。通过应用基于代理的模型和蜂窝自动机技术,还将研究Rethymno城市系统作为风险演变因素的社会经济维度。发达的情景将考虑当地条件和洪水问题以及利益相关者的视角,需求和野心。利益攸关方的参与及其与综合建模框架的参与及其成果将有助于开发用于Rethymno的洪水风险管理的可行路线图。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号