首页> 外文会议>Rock Dynamics Summit >Some considerations on the failure of Guney Waterfall, Denizli, Turkey
【24h】

Some considerations on the failure of Guney Waterfall, Denizli, Turkey

机译:关于金刚瀑布失败,土耳其的几点思考

获取原文
获取外文期刊封面目录资料

摘要

The Guney Waterfall in Denizli was ruptured by the The 21st July 2003 Buldan earthquake with magnitude 5.6, The ruptured block toppled after 10 years and traveled towards the reservoir of Cindere Dam more than 132 m. The authors attempt to clarify the mechanism and process of the toppling failure of the ruptured block. The authors attempt to analyse the failure process in fundamentally in three stages. The first stage is the initial failure caused by the earthquake. The second stage is the growth of the ruptured block and progress of degradation at the toe of the failed block. Third stage is the final collapse and movement in the valley towards the Cindere Dam reservoir. The pre-rupture stage before the Buldan earthquake and post-rupture and final collapse conditions are analysed through some analytical and numerical techniques to understand the fundamental causes of the failure, which took more than 10 years. This is study is unique in a sense it involves slow and rapid dynamic processes. The authors present the results of the various studies and investigations undertaken so far and and they discuss their implications.
机译:该居内伊瀑布德尼兹利由21 2003年7月布尔丹级地震5.6级,该块破裂10年后倒塌,对Cindere大坝超过1.32米的水库走过破裂。作者试图澄清机制和破裂的块的倾倒破坏的处理。笔者试图分析在根本上三个阶段的破坏过程。第一阶段是地震造成的初始故障。第二阶段是破裂的块和降解的进展中的失败的块的趾部的生长。第三阶段是在朝着Cindere大坝水库山谷中的最后崩溃和运动。在布尔丹地震破裂后,并最终崩溃的条件之前预破裂阶段是通过一些分析和数值方法分析,以了解发生故障,历时超过10年的根本原因。这是研究是它涉及到快速和慢速动态过程的感觉是独一无二的。作者提出的各种研究和调查的结果至今承担并和他们讨论他们的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号