首页> 外文会议>IMEKO International Conference on Metrology for Archaeology and Cultural Heritage >Business Process Management and Building Information Modeling for the innovation of cultural heritage restoration process
【24h】

Business Process Management and Building Information Modeling for the innovation of cultural heritage restoration process

机译:文化遗产恢复过程创新的业务流程管理与建设信息建模

获取原文

摘要

Cultural heritage is a complex ecosystem requiring innovative methods and techniques to facilitate its management and valorization. In detail, restoration processes have to preserve the original characteristics of historical buildings or sites, by involving different professional figures, each one with different roles, responsibilities and skills. In this light, a system that facilitates the information management, supported by new technologies, could allow more precise, efficient and traceable information exchange and could optimize the construction and management operative phase. Starting from these assumptions, this research proposes the application of a new integrated approach to a restoration process of a historical building. It consists in applying BPM technique and BIM methodology to provide valuable insights to optimize the data flow, to gather information and to share knowledge during the restoration process through the lifecycle management, by facilitating the ordinary and extraordinary maintenance, really essential for the Italian heritage.
机译:文化遗产是一个复杂的生态系统,需要创新的方法和技术,以促进其管理和价格稳定。具体而言,恢复过程必须保留历史建筑或遗址的原有特性,通过涉及不同专业的人物,每一个不同的角色,职责和技能。鉴于此,有利于信息管理系统,通过新技术的支持,可以让更精确,高效和可交流信息和可以优化的建设和管理工作的阶段。从这些假设出发,研究提出了一种新的综合方法,以历史建筑的修复过程中的应用。它包括在应用BPM技术和BIM方法提供有价值的见解,以优化数据流,通过生命周期管理在还原过程中收集信息,并共享知识,通过促进普通和特殊维护,为意大利遗产真的是必不可少的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号