首页> 外文会议>International Workshop on Personal Computers and Particle Accelerator Control >BENEFITS, DRAWBACKS AND CHALLENGES DURING A COLLABORATIVE DEVELOPMENT OF A SETTINGS MANAGEMENT SYSTEM FOR CERN AND GSI
【24h】

BENEFITS, DRAWBACKS AND CHALLENGES DURING A COLLABORATIVE DEVELOPMENT OF A SETTINGS MANAGEMENT SYSTEM FOR CERN AND GSI

机译:在CERN和GSI设置管理系统的协同开发期间的利益,缺点和挑战

获取原文

摘要

The settings management system LSA (LHC Software Architecture) [1] was originally developed for the LHC (Large Hadron Collider). For FAIR (Facility for Antiproton and Ion Research) a renovation of the GSI control system was necessary. When it was decided in 2008 to use the LSA system for settings management for FAIR, the middle management of the two institutes agreed on a collaborative development. This paper highlights the insights gained during the collaboration, from three different perspectives: organizational aspects of the collaboration, like roles that have been established, planned procedures, the preparation of a formal contract and social aspects to keep people working as a team across institutes. It also shows technical benefits and drawbacks that arise from the collaboration for both institutes as well as challenges that are encountered during development. Furthermore, it provides an insight into aspects of the collaboration which were easy to establish and which still take time.
机译:设置管理系统LSA(LHC软件架构)[1]最初为LHC(大型Hadron Coller)开发。对于公平(Antiproton和Ion Research的设施),GSI控制系统的翻新是必要的。当它在2008年决定使用LSA系统进行公平的环境管理时,两所研究所的中间管理就同意了协同发展。本文突出了合作期间获得的见解,从三种不同的观点:合作的组织方面,如建立,计划程序,编写正式合同和社会方面的角色,以使人们在跨学院担任团队。它还展示了从两个机构的合作以及在开发期间遇到的挑战所产生的技术效益和缺点。此外,它提供了易于建立的协作的各个方面,仍然需要时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号