首页> 外文会议>International Conference on Energy Equipment Science and Engineering >Applications of tunnel perspective method in 21302 work-face Xiangshan coal mine
【24h】

Applications of tunnel perspective method in 21302 work-face Xiangshan coal mine

机译:隧道透视法在21302工作面前湘山煤矿的应用

获取原文

摘要

Through data collection, procession and interpretation of 21302 work-face Xiangshan coal mine using radio wave tunnel perspective method (tunnel perspective method), the geology abnormal range and characteristic was given, and those data will be the geology direction for work-face safety exploitation. Research approach from the expatiate of tunnel perspective tomography principle, working and interpretation method emphases on the research of the data pro-process, CT imaging diagram analysis and characteristic judgment of geology abnormal . According to the method discussed above, 21302 work-face geology abnormal range was given and characteristic judgment results of geology abnormal was given, too.
机译:通过数据收集,游行和解释21302工作面的象山煤矿采用无线电波隧道透视方法(隧道透视方法),给出了地质异常范围和特征,并且这些数据将是工作面安全开发的地质方向。从隧道透视层面的外界,工作和解释方法的研究方法对数据的研究,CT成像图分析与地质异常特征判断的重点。根据上述方法,给出了21302个工作面地质异常范围,并给出了地质异常的特征判断结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号