首页> 外文会议>International Conference on Energy Material, Chemical Engineering and Mining Engineering >Research and Application of Technical Pipe String with Integrating Layered Gas Production in Oil Production Engineering of Mining Engineering
【24h】

Research and Application of Technical Pipe String with Integrating Layered Gas Production in Oil Production Engineering of Mining Engineering

机译:矿业工程石油生产工程中分层天然气生产技术管柱的研究与应用

获取原文

摘要

In oil production engineering, layered gas production is an important mining technology. While the interlayer pressure of natural gas well differs big, the interlayer interference forms. It is difficult to exploit the low pressure layer and control the high pressure layer. Developing a technical pipe string with integrating layered gas production can solve the above problems. This technical pipe string changes throttling area by striking, solves the conflicts between each layer, mines each layer uniformly and enhances recovery. It applied to Tai 4-28 gas well in Scbei-gas-field which is located in east of Qaidam basin perfects the 4th department of shallow layer well pattern, forms new capacity, controls each layer pressure and capacity smoothly, protects the reservoirs effectively, achieves good effect in practice.
机译:在石油生产工程中,分层天然气生产是一种重要的采矿技术。虽然天然气的层间压力很大,但层间干涉形式不同。难以利用低压层并控制高压层。开发具有整合分层气体生产的技术管柱可以解决上述问题。该技术管弦串通过撞击来改变节流区域,解决每个层之间的冲突,均匀地填充每个层并增强恢复。它在柴达姆盆地东部的Scbei-Gas-Field井施加到泰4-28天然气,完善第四次浅层井图案,形成新的容量,控制每层压力和容量平稳,有效保护水库,在实践中取得了良好的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号