首页> 外文会议>International Conference on Intelligent and Fuzzy Systems >Qualitative Factors in the Fuzzy Earned Value Method
【24h】

Qualitative Factors in the Fuzzy Earned Value Method

机译:模糊赚取的价值法的定性因素

获取原文

摘要

The Earned Value Method is in the first place a tool of project cost control. In consecutive control moments the attempt is made to reestimate the total cost of the whole project, individual activities or groups of activities, taking into account the information available in the control moment. Because the method is future oriented, the fuzzy approach is here more than appropriate. There exist several fuzzy versions of the method. None of them, however, allows to take into account important qualitative factors (inducing emotions, rumours about changes in the project, negotiations going on etc.). This paper proposes such a fuzzy version of the method which allows considering such factors. Additionally, the proposed method focuses on individual activities (and not on the whole project, like the existing methods). The most critical activities in terms of cost should be selected for analysis.
机译:赚取的值方法首先是一个项目成本控制的工具。 在连续控制时刻,考虑到控制时刻可用的信息,将重新获得整个项目,个别活动或活动组的总成本。 因为该方法是未来导向的,所以模糊的方法在这里不仅仅是适当的。 存在多个模糊版本的方法。 然而,没有一个人允许考虑重要的定性因素(诱导情绪,关于项目的变化,谈判进入的谣言等)。 本文提出了这种方法的模糊版本,允许考虑这些因素。 此外,所提出的方法侧重于各个活动(而不是整个项目,如现有方法)。 应选择成本最关键的活动进行分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号