首页> 外文会议>International Conference on Human Interaction and Emerging Technologies >Process Improvement Proposal for the Reduction of Machine Setup Time in a Copper Transformation Company Using Lean Manufacturing Tools
【24h】

Process Improvement Proposal for the Reduction of Machine Setup Time in a Copper Transformation Company Using Lean Manufacturing Tools

机译:使用精益制造工具进行铜制转换公司减少机器设置时间的过程改进提案

获取原文

摘要

This study aimed to identify the causes of significant problems existing in the metallurgical sector, and a solution is proposed for the setup process. We detail the theoretical background of the processes in the lean manufacturing methodology, which will be applied to a rolling machine. Further, we provide a brief description of the company and the sector's problems. We describe success stories of companies that implemented various lean manufacturing tools. We also present some of the results achieved across sectors to gain an in-depth understanding of the technique and a practical support of the implemented model. Our proposal is based on the lean manufacturing methodology; tools such as Single Minute Exchanges of Dies, Kaizen, 5S, and value stream mapping (VSM) will be used to reduce setup times and to impact machine layout and productivity positively. We also show the implementation results of a pilot plan conducted in the company over a period of more than 3 months.
机译:本研究旨在确定冶金部门存在的重大问题的原因,提出了一个解决方案的设置过程。 我们详细介绍了精益制造方法中工艺的理论背景,将应用于轧机。 此外,我们提供了公司简要说明和部门的问题。 我们描述了实施各种精益制造工具的公司的成功案例。 我们还展示了跨部门实现的一些结果,以深入了解该技术和实施模型的实际支持。 我们的提案基于精益制造方法; 诸如单分钟的斗牛,kaizen,5s和价值流映射(VSM)等工具将用于减少设置时间并积极影响机器布局和生产率。 我们还展示了公司在公司在3个月内进行的试点计划的实施成果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号