首页> 美国卫生研究院文献>other >Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time
【2h】

Single Machine Scheduling and Due Date Assignment with Past-Sequence-Dependent Setup Time and Position-Dependent Processing Time

机译:单机调度和到期日分配以及与过去顺序相关的设置时间和与位置相关的处理时间

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper considers single machine scheduling and due date assignment with setup time. The setup time is proportional to the length of the already processed jobs; that is, the setup time is past-sequence-dependent (p-s-d). It is assumed that a job's processing time depends on its position in a sequence. The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. We first consider the model with job-dependent position effects. For each case, by converting the problem to a series of assignment problems, we proved that the problems can be solved in O(n 4) time. For the model with job-independent position effects, we proved that the problems can be solved in O(n 3) time by providing a dynamic programming algorithm.
机译:本文考虑了单机调度和带有设置时间的截止日期分配。设置时间与已处理作业的长度成比例;也就是说,建立时间取决于过去的顺序(p-s-d)。假定作业的处理时间取决于其在序列中的位置。目标功能包括总提前期,拖延工作的加权数量以及到期日分配成本。我们使用两种不同的到期日分配方法来分析这些问题。我们首先考虑具有与职位相关的职位效应的模型。对于每种情况,通过将问题转换为一系列分配问题,我们证明了问题可以在O(n 4 )时间内解决。对于具有与职位无关的职位效应的模型,我们证明了通过提供动态规划算法可以在O(n 3 )时间内解决问题。

著录项

  • 期刊名称 other
  • 作者单位
  • 年(卷),期 -1(2014),-1
  • 年度 -1
  • 页码 620150
  • 总页数 9
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-21 11:17:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号