In order to solve the problem of planning and optimizing the production takt of a key link in the rocket assembly workshop. The production takt is obtained through the modeling and Simulation analysis of the actual plant based on the Plant Simulation, a professional discrete Simulation software. The factors that affect the production takt are obtained qualitatively and the influences of these factors are quantified, and the configuration of these factors is finally determined through the DOE experiment method to make the production takt reach the practical optimal and the theoretical optimal.