首页> 外文会议>Conference on Innovation in Technology and Engineering Science >Analytical Network Process(ANP)for priority setting of strategic roads handling at Tebo Regency
【24h】

Analytical Network Process(ANP)for priority setting of strategic roads handling at Tebo Regency

机译:Tebo Regency战略道路优先设置的分析网络过程(ANP)

获取原文

摘要

Development of transportation infrastructure in the region aims to meet the needs of the community to facilitate mobility of people,goods,and services.However,the work of transportation infrastructure requires a large amount of cost while the development budget is limited.Therefore,a careful determination of the priority of road handling is urgently required.In this study,an analysis was conducted to determine the priority of handling strategic roads in Tebo Regency.This study uses the Analytic Network Process(ANP)method with 4(four)criteria to determine the priority of road handling,namely:engineering,economics,regional potential,and policies.It was found that National Road - Pintas being the first priority with a weight of 0.252,then the second priority for National Road - Lubuk Mandarsah with a weight of 0.23.The third priority is Unit I Rimbo Bujang - Unit XI Rimbo Ulu Road with a weight of 0.211.
机译:该地区交通基础设施的发展旨在满足社区的需求,促进人们,商品和服务的流动性。但是,交通基础设施的工作需要大量成本,而发展预算有限。因此,小心迫切需要确定道路处理的优先级。在本研究中,进行了分析,以确定处理Tebo Regency的战略道路的优先级。本研究采用了4(四个)标准的分析网络过程(ANP)方法来确定道路处理的优先事项,即:工程,经济学,区域潜力和政策。据发现,国家道路 - 皮斯特是重量重点0.252的优先权,然后是国家道路的第二个优先事项 - Lubuk Mandarsah重量0.23.第三优先事项是I rimbo Bujang - 单位Xi Rimbo Ulu路,重量为0.211。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号