The Dublin San Ramon Services District (District) Dublin Trunk Rehabilitation Project rehabilitated approximately 8,000 linear feet of deteriorating 33-, 36-, 39-, and 42-inch reinforced concrete trunk sewer that conveys approximately 50 percent of the District's wastewater flows. The Dublin Trunk sewer is located within highly trafficked roads in residential and busy commercial areas in the cities of Dublin and Pleasanton, California. The trunk sewer also crosses a number of other jurisdictions, including the California Department of Transportation (Caltrans), Zone 7 Water Agency (Zone 7), East Bay Regional Parks District (EBRPD), the District's wastewater treatment plant, and a number of private commercial properties.To minimize public impact, the District selected steam-cured, cured-in-place pipe (CIPP) lining as the preferred rehabilitation method. That decision was the easy part; the real work was developing—and then continually revising—the bypass pumping plan that supported CIPP installation. The City of Dublin was far more concerned with the bypass setup and potential impacts on residents and businesses than the rehabilitation process. To shorten construction, the City allowed the contractor to install the CIPP lining 24 hours a day. Detailed engineering was needed to design bypass pump placement and undergrounding, mitigate impacts to traffic signals, negotiate work hours, and determine the best locations and methods for crossing a flood control channel and interstate highway. Many of these factors significantly impacted the project’s cost and time.This paper describes how trenchless technologies and creative bypass pumping can meet tight schedules, overcome accessibility constraints, comply with traffic control requirements, and address diverse stakeholder concerns to rehabilitate a critical trunk sewer.
机译:都柏林圣拉蒙服务区(区)都柏林干线康复项目恢复了大约8,000个线性脚,劣化33-,36-,39和42英寸的钢筋混凝土干线,该钢水干线传达了大约50%的地区的废水流动。都柏林干线下水道位于加利福尼亚州都柏林和普莱森顿市的住宅和繁忙的商业区的高度贩运道路。行李箱下水道还穿过许多其他司法管辖区,包括加州交通部(Caltrans),7区水局(7区),东湾地区公园区(EBRPD),该区的废水处理厂,以及许多私人商业物业。为了最大限度地减少公共影响,区选择蒸汽固化,固化管(CIPP)衬里作为优选的康复方法。那种决定是容易的;实际工作正在开发 - 然后不断修改 - 支持CIPP安装的旁路抽水计划。都柏林市更关注旁路设置和对居民和企业的潜在影响而不是康复过程。为了缩短建筑,这座城市允许承包商每天24小时安装CIPP衬里。需要详细的工程来设计旁路泵放置和地下,减轻对交通信号的影响,协商工作时间,并确定交叉防洪道和州际公路的最佳位置和方法。其中许多因素显着影响了项目的成本和时间。本文介绍了如何满足严格的时间表,克服可访问性限制,符合交通管制要求,以及解决各种利益相关者的问题,涉及恢复临界下水道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号