首页> 外文会议>NASTT s No-Dig Show Conference >Using Bore Planning Software to Complete Challenging Airport Fiber Optic Project
【24h】

Using Bore Planning Software to Complete Challenging Airport Fiber Optic Project

机译:使用钻孔计划软件完成挑战机场光纤项目

获取原文

摘要

A solid reputation for thorough planning is what won Pinnacle Construction & Directional Boring, Inc. of Charleston, South Carolina, the bid on a challenging fiber optic installation job at the Charleston International Airport. In total, the team bored more than 2,500-ft (762 m) of 2x4-in (5.1x10.2 cm) for power and fiber conduit at the airport. However, the most challenging shot was the 285-ft (86.9 m) long bore that started just outside of the airport and ended in the terminal’s basement - 12-ft (3.7 m) below grade through a 20-in (50.8 cm) hole located 48-in (120.9 cm) off the floor in the baggage handling area. To hit that hole, bore planning software was used to map the bore ahead of time, GPR to confirm locations under main terminal access road, GPS to plot the course and on-the-rig software to complete the bore successfully. The team also needed to use a professional surveyor and a vacuum service company to support the crew on this unique project.
机译:彻底规划的稳固声誉是索尔斯顿南卡罗来纳州查尔斯顿的Pinnacle Construction&Directional Boring,Inc。在查尔斯顿国际机场挑战纤维的光学安装工作。总共,在机场的电力和纤维导管,团队钻取超过2,500英尺(762米)的2x4-in(5.1x10.2 cm)。然而,最具挑战性的镜头是285英尺(86.9米)的长孔,在机场之外开始,在终端的地下室 - 12-FT(3.7米)以下通过20英寸(50.8厘米)孔位于行李搬运区的地板上位于48英寸(120.9厘米)。要击中该洞,钻孔规划软件用于提前映射孔,GPR在主终端接入路面下确认位置,GPS绘制课程和钻机的软件成功完成钻孔。该团队还需要使用专业测量师和一个真空服务公司来支持这一独特项目的船员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号