首页> 外文会议>SPE International Conference and Exhibition on Formation Damage Control >Prevention of Core Jamming and Damage During Coring Operations byOptimization of Drilling Parameters – Analysis of Case Studies
【24h】

Prevention of Core Jamming and Damage During Coring Operations byOptimization of Drilling Parameters – Analysis of Case Studies

机译:通过优化钻探参数芯片核心干扰和损伤 - 案例研究分析

获取原文

摘要

Coring is a considerably costly drilling operation,but vital to retrieve valuable sources of ground-truth datain the oil and gas industry.To justify the high cost of this operation,essentially,cores should not undergojamming and mechanical damage.Core jamming not only indicates an unprecedented termination of theoperation,but also causes severe damage to the core column already taken in the barrel.This means thatthe cores cannot be retrieved with sufficient key performance indicators(KPIs);thus,it would not reliablyrepresent reservoir properties.Reaching this significant target can be ensured not only by proper design,but also by online monitoring and investigation of the drilling parameters.This investigation predicatedon several case studies in the Middle East to identify the effect of imperfect decisions made by the driller.Based on the experience and observations,the paper provides practical recommendations to alleviate theimpact of such negative actions.The drilling parameters observed in the mud logging data of six coring case studies(of several runsfrom three wells in carbonate reservoirs)were investigated at the depth interval just prior to jammingoccurrence.These parameters consist of rate of penetration(ROP),torque,weight on the bit(WOB),rotaryspeed(revolutions per minute,RPM),circulation rate,and standpipe pressure(SPP).In this work,a maincause of the core jamming occurrences is discussed;that is,the improper drilling parameters application,asmismanaged by the driller.Finally,as indications of jamming,sudden variations of the drilling parametersat the specified depth were investigated.Such study can contributeto the better monitoring for future coringoperations.Based on the observations in six case studies in three wells,WOB was identified as the most significantreason causing core jamming;that is,jamming occurred when the WOB was not steadily maintained onthe bit probably due to the driller's inexperience,shift change,etc.For monitoring,torque decrease,ROPdecrease,and SPP variation or decrease(following initial increases)were identified as indications of corejamming.Torque showed to be a significant parameter forjamming detection when it decreases or its trendbecomes completely straight,i.e.,without any variations,indicating that the core head may not be in contactwith the formation.Next,drilling issues during coring(such as pump failure)can contribute to subsequentjamming.The case studies in this paper provide several observations and indications of core jamming occurrences ina limestone reservoir which can be attributed to non-optimized drilling parameters.The paper also providesseveral practical recommendations and measures to prevent core jamming and core damage.
机译:取心是相当昂贵的钻井作业,但重要的检索数据输入石油和天然气地面实况的重要来源industry.To证明这种操作的成本高,本质上,内核不应该undergojamming和机械damage.Core干扰不仅表示前所未有theoperation的终止,而且也导致已经采取在barrel.This芯柱的严重损坏装置thatthe芯不能以足够的关键性能指标(KPI)进行检索,因此,它不会reliablyrepresent储properties.Reaching此显著靶可确保不仅通过合理的设计,而且还通过在线监测和钻井parameters.This调查predicatedon中东一些案例研究的调查,以确定由driller.Based的经验和观察,做出决定,不完美的效果本文提供了实际的建议,以减轻这些负面actions.The钻井参数OB的theimpact在六个取心案例研究的泥浆测井数据erved(几个runsfrom的碳酸盐岩储层中三个孔)在深度间隔进行了研究之前,为了jammingoccurrence.These参数对位由钻进速度(ROP),扭矩,重量的( WOB),rotaryspeed(每分钟,RPM),循环速率,和立管压力(SPP)。在这项工作转数,芯干扰出现的maincause讨论;即,不当钻井参数应用,由钻机asmismanaged。最后,由于干扰的迹象,钻井parametersat指定深度的突然变化是investigated.Such研究,可以有助于增加更好地监测未来的三口井在六个案例研究coringoperations.Based上观察,WOB被确定为最significantreason造成芯干扰的,也就是说,干扰发生时的WOB没有稳定维持onthe位可能是由于司钻缺乏经验,换档等,为监测,转矩减少,R OPdecrease,和SPP变化或降低被鉴定为corejamming.Torque的指示(以下初始增加),证实是一个显著参数forjamming检测时,它降低或它的trendbecomes完全直的,即,没有任何变化,表明芯头可能不可以在contactwith的formation.Next,取芯(如泵故障)在钻井问题可以向subsequentjamming.The案例研究在本文中提供了若干意见和芯的指示堵塞发生INA石灰石储器可以归因于非优化钻井参量。文中还providesseveral切实可行的建议和措施,以防止核干扰和堆芯损坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号