首页> 外文会议>International Tropical Renewable Energy Conference >Design and construction of indoor air handling unit of a psychrometric chamber for split air conditioner testing
【24h】

Design and construction of indoor air handling unit of a psychrometric chamber for split air conditioner testing

机译:用于分流空调测试的心理腔室室内空气处理单元的设计与施工

获取原文

摘要

Due to the high level of population of the Indonesian citizen affecting the necessities of the Indonesian citizen, one of which is the needs for electricity., the government through the Ministry of Energy and Mineral Resources made PERMEN ESDM number 7 of 2015 concerning the application of minimum energy performance standards and the inclusion of energy-saving labeling for air conditioning (AC) equipment that refers to SNI 19 -6713-2002 and adapted from ISO 5151. The performance of testing method that used in this system is the air enthalpy method. In using the air enthalpy method requires an isolated test chamber to reach the required temperature (°C) and humidity (% RH), the rooms called psychometric chamber. The standard condition for testing the indoor air conditioning room (evaporator) is 27°C with 47% of RH while, the standard for the air inside outdoor conditioning room (condenser) is 35°C and the % RH is not required for the test. The tool that used to control temperature and humidity in the room is an Air Handling Unit (AHU) which consists of a filter, cooling coil, humidifier, coil heater, and air blower. The AHU filter is used to filter the airs that enter the AHU. AHU which is used is connected to Chiller to regulate the temperature of the water flowing on the cooling coil and heating coil using a heat recovery system which aims to control the air temperature that will flow to the testing room by adjusting the percentage of opening area of the motorized valve that connected to the coils. The humidifier that installed inside AHU splashes water to increase the humidity of the air that will enter the heating coil. The temperature and the humidity of air that has been conditioned are blown into the room with blower. The parameters that used for this conditioning room are variable storage capacity, humidification, and heating capacity.
机译:由于印度尼西亚公民的高水平,影响印度尼西亚公民的必需品,其中一个是电力的需求。政府通过能源和矿产资源部制定了2015年的彼斯·埃斯特姆第7号关于适用最小能量性能标准以及空调(AC)设备的节能标签,指的是SNI 19 -6713-2002并从ISO 5151调整。该系统中使用的测试方法的性能是空气焓方法。在使用空气焓方法时需要一个隔离的测试室来达到所需的温度(°C)和湿度(%RH),房间被称为心理测量室。用于测试室内空调室(蒸发器)的标准条件是27°C,卷47%,户外调理室内的空气标准(冷凝器)为35°C,试验不需要%RH 。用于控制房间温度和湿度的工具是空气处理单元(AHU),其由过滤器,冷却线圈,加湿器,线圈加热器和空气鼓风机组成。 AHU过滤器用于过滤进入AHU的空气。使用的AHU连接到冷却器,以调节在冷却线圈上流动的水的温度,使用热回收系统来控制将通过调节开口面积的百分比来控制对测试室的空气温度电动阀连接到线圈。安装在AHU内的加湿器溅水以增加进入加热线圈的空气的湿度。已经调节的空气的温度和湿度被吹进到带有鼓风机的房间。用于该调节室的参数是可变存储容量,加湿和加热容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号