首页> 外文会议>International Workshop on Advances in Energy Science and Environment Engineering >Study of technology of pile foundation construction of no.5 main pier of Shoujiang bridge in Wenchuan County
【24h】

Study of technology of pile foundation construction of no.5 main pier of Shoujiang bridge in Wenchuan County

机译:汶川县寿江桥5号桩基建设技术研究

获取原文

摘要

The group of pile foundation of no.5 pier in Shoujiang Bridge needs to overcome the big load of large span continuous steel structure. The length of single pile foundation is 77m and the diameter of single pile foundation is 250cm. It not only faces the flood in the upstream of Shoujiang river, the construction obstacles during summer rain period, but also the reservoir clearance activity of Zipingpu reservoir and the high water level in winter and other water level fluctuation that have huge impact on platform of pile foundation construction. This article introduces the preparation in aspect of personnel, material, equipment and so on of pile foundation construction, and also conduct intensive research on leveling the field, assaying pile location, the embedment of the steel casing, installing the drill, mixing mud, drilling, final hole inspection and clearance, steel cage construction, perfusing concrete under water.
机译:寿江桥梁5号码头桩基集团需要克服大跨度连续钢结构的大负荷。单桩基础的长度为77米,单桩基础直径为250厘米。它不仅面临寿江河上游的洪水,夏季下雨期间的建筑障碍,也是Zipingpu水库的水库清除活动和冬季水平的高水位和其他水位波动,对桩平台产生巨大影响基础建设。本文介绍了桩基建设人员,材料,设备等方面的制备,并对田地,测定桩位置,钢套管的嵌入进行了密集研究,安装钻头,搅拌泥浆,钻孔,最终孔检验和清除,钢笼施工,灌注混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号