首页> 外文会议>Offshore Mediterranean Conference and Exhibition >DUAL BOOSTING ESPs COMPLETION: DESIGN PHILOSOPHY AND EXPERIENCE GAINED IN TEMPA ROSSA.
【24h】

DUAL BOOSTING ESPs COMPLETION: DESIGN PHILOSOPHY AND EXPERIENCE GAINED IN TEMPA ROSSA.

机译:双重提升ESPS完成:Tempa Rossa中获得的设计哲学和经验。

获取原文

摘要

Tempa Rossa is an oil field within Gorgoglione Concession in Basilicata region, Italy, discovered in 1989. Lying more than 4,000 meters beneath the surface, the field is planned to be produced with height wells. One of six existing well has a total depth around 7145mMD, and another well has a horizontal drain around 600m. Dual Boosting ESP system is the selected solution to deliver 10 000 blpd per well as production target rate. The ESP and completion string were designed considering the limited size of production casing, the high stresses (tubing movement, tension, weight, pressure) and the corrosive environment from the oil characteristics. According to the casing size, two completion designs were created to deploy the dual boost system (type A for 9-5/8” production casing and type B for 7-5/8” casing). The ESPs can be operated as single, back-up system, or as dual boost system. For the first production years, the ESP will be used in back up mode, thanks to high reservoir pressure, and then subsequently with declining reservoir pressure, the dual boost system will be operated to maintain the required flow. A Work-Over campaign started in March 2016 with the objective to equip the six existing wells with new upper Dual ESP completion in anticipation of the first oil. Under abstract submission’s date, four of the six Tempa Rossa wells have been equipped with Dual ESP completion: three type A and one type B. Significant improvements in running performances have already been observed thanks to the dedicated operation follow-up. A post ESP installation data monitoring has been put in place, thru a dashboard, to allow the detection of potential early failure of the Dual ESP system during the idle period until production start-up. Operation follow-up and data monitoring are key factors to minimize the probability of ESP failure prior to the first oil. Mitigation measures for ESP preservation during long period play a key role to accomplish first oil and planned ramp-up in due time.
机译:Tempa Rossa是意大利巴斯利卡托地区Gorgoglione特许权的油田,于1989年发现。躺在地面下方超过4000米,该领域计划用高度井生产。六个现有井中的一个总深度约为7145mmd,另一个井的水平排放约为600米。双升压ESP系统是选定的解决方案,以提供10 000个BLPD,作为生产目标率。设计了ESP和完成字符串,考虑了生产套管的有限尺寸,高应力(管道运动,张力,重量,压力)和来自石油特性的腐蚀环境。根据套管尺寸,创建了两种完成设计以部署双升压系统(型号为9-5 / 8“生产壳体,B型为7-5 / 8”套管“。 ESP可作为单个,备用系统或双升压系统运行。对于第一个生产年来,由于高储层压力,ESP将用于备份模式,然后随后随后储层压力下降,将操作双升压系统以维持所需的流量。在2016年3月开始的工作竞选活动,目的是在预期第一石油的情况下为六种现有的井有新的上双ESP完成。在抽象的提交日期,六个腾波Rossa Wells中有四台井已经配备了双ESP完成:三种A型和一种B.由于专门的操作跟进,已经观察到运行表演的显着改进。 ESP安装数据监控已到位,通过仪表板进行到位,允许在空闲期间检测双ESP系统的潜在早期故障,直到生产启动。操作跟进和数据监控是最小化第一油前ESP故障概率的关键因素。长期保存的缓解措施起到适当时期的第一个石油和计划加速的关键作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号