首页> 外文会议>SPE Russian Petroleum Technology Conference >Case Studies of Gascondensate Field with Oil Rim Development:Search for Effective Methods of Oil Production from Thin Rims
【24h】

Case Studies of Gascondensate Field with Oil Rim Development:Search for Effective Methods of Oil Production from Thin Rims

机译:汽油晶体岩石钢板开发的案例研究:从薄轮辋中寻找石油生产的有效方法

获取原文

摘要

The present work is dedicated to the problem of developing oil and gas condensate pools with thin oil rims for neocomian deposits in the Urengoy region,and to the search for effective methods of oil production from thin rims.The key problems in the development of thin rims are the low cumulative oil production per well,as a result-low profitability and oil recovery ratio.The reasons are known:a sharp decline in initial oil rate due to the rapid increase in water cut and growth of gas factor associated with the water and gas coning.The results of hydrodynamic modeling at early stage in the development of oil rims often lead to optimistic forecasts that are not confirmed in practice.The paper provides an analysis of the reasons for optimistic calculations,tuning up models for the results of the development and operation of oil wells with different completion relative to the GOC.Obtaining history-matched oil and gas production systems made it possible to obtain a more reliable production forecast for oil wells,to substantiate the preferred target subsea depth for the completed interval in the rim and the type of completion.Scenarios with the completion of the horizontal section at a distance of one third from the GOC and OWC,or in the middle between the contacts,have been considered and analyzed.A comparison of the calculated performance of the wells with the actual one had been made.An economic evaluation of the operational efficiency of wells drilled on thin rims shows that their profitability based on oil production is marginal.The closer completion intervals of the oil horizontal wells to the GOC the higher economic efficiency of their operation due to additional volumes of gas and condensate production from the gas cap.The use of double-wellbore and multi-lateral completion of horizontal wells in the oil rim increases the economic attractiveness of the project.The integrated approach proposed in the paper to the organization of production and oil and gas processing systems from such oil wells makes it possible to technologically efficiently operate wells and ensure almost full utilization of associated gas.The joint development of gas condensate pools with thin oil rims allows for the cost-effective development of the ones.
机译:本作本作致力于将石油和天然气冷凝水池与Urengoy地区的薄油圈开发出油气和气体冷凝水池的问题,并寻求从薄轮辋的石油生产的有效方法。薄轮辋开发的关键问题是低累积的油生产,作为低盈利能力和石油回收率。已知原因:由于水切割和与水有关的气体因子的燃气因子的快速增加,初始油速率的急剧下降天然气吻合。石油轮辋发展早期流体动力学建模的结果往往导致在实践中未经证实的乐观预测。本文提供了乐观计算的原因分析,调整了发展结果的模型与Goc.obtaining历史匹配的石油和天然气生产系统不同完成的油井的运行使得可以获得更可靠的生产对油井的预测,在边缘中完成所完成间隔的优选目标海底深度和完成的类型。在GOC和OWC中的一个三分之一的距离处或在中间完成水平部分已被考虑和分析联系人。已经制定了实际井的计算性能的比较。在薄轮辋上钻井井的运营效率的经济评估表明,他们基于石油产量的盈利能力是边缘的。由于额外的气体和气体盖的净化物生产,油水平井的越来越近于GoC的经济效率较高的经济效率。使用双井眼和多横向完成油中的水平井。 RIM增加了该项目的经济吸引力。本文提出的综合办法提出了生产和石油和天然气处理来自这种油井的G系统使得可以技术有效地操作井并确保几乎充分利用相关气体。具有薄油轮辋的气体冷凝水池的联合开发允许成本效益的开发。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号