首页> 外文会议>CIRP Design Conference >Method for the Evaluation and Adaptation of New Product Development Project Complexity
【24h】

Method for the Evaluation and Adaptation of New Product Development Project Complexity

机译:新产品开发项目复杂性评估和适应方法

获取原文

摘要

This paper presents a method that enables project managers to evaluate the complexity of an intended new product development project and adapt it to ensure fit with the organization's capacities and the project setting. Central hypothesis is that complexity drivers of the project are causing resource consumption and thus costs. Therefore, a systematic evaluation of complexity drivers and their subsequent demand placed on the resources of the organization for each activity of the project needs to be conducted. For this purpose a novel approach based on a resource-oriented process cost calculation method has been developed. The approach includes a consideration of uncertainties regarding the complexity impact and definition of a capacity to tolerate complexity. Consequently, by analyzing the project's complexity for its cost and resource impact as well as comparing it with the organization's capacities, planners are able to identify critical complexity drivers upfront that would disrupt project execution and develop countermeasures.
机译:本文介绍了一种方法,使项目经理能够评估预期的新产品开发项目的复杂性,并适应它以确保适合组织的能力和项目设置。中央假设是该项目的复杂性驱动程序导致资源消耗,从而成本。因此,需要进行对复杂性驱动因素的系统评估及其随后对项目各项活动进行组织资源的后续需求。为此目的,已经开发了一种基于资源导向的过程成本计算方法的新方法。该方法包括考虑关于耐受复杂性能力的复杂性影响和定义的不确定性。因此,通过分析项目的成本和资源影响以及与组织的能力进行比较,规划者能够识别预先扰乱项目执行和制定对策的关键复杂性驱动程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号