Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

机译:创新项目的有效风险管理 - 以克拉科夫智能大厦实验室效率建设为例

获取原文

摘要

Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLIM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.
机译:许多建筑项目未能达到截止日期,或者他们超过假定的预算。在创新项目的情况下,这种情况特别普遍,其中识别高危延迟和超出假定成本的识别率高,使得一个潜在的有利可图的项目。高风险水平远远超过标准非创新项目的风险水平,是创新项目的实现阶段的特征。这不仅与设计和施工阶段的复杂性更大相关,而且还与新技术和原型解决方案的应用有关,缺少专业领域具有合适专业知识的合格人员,并且能够正确地识别之间的差距可用和必需的知识和技能。本文讨论了创新项目中有效风险管理的过程,以实现克拉科夫 - DLIM实验室智能大厦实验室的创新,节能和可持续建设的实现阶段的实例,从Dorbud SA的角度来看,其一般承包商。本文提出了一种新的创新建设项目风险管理过程方法。风险管理进程分为五个阶段:收集信息,确定重要的不需要事件,第一次风险评估,开发和风险反应策略的选择,在引入风险反应后评估残留风险。 18确定了一个创新建筑项目中的不需要的事件。使用双参数风险矩阵进行第一风险评估,其中分析了不需要的事件发生的可能性及其后果。定义了三种风险:可容忍,控制和不受控制。开发了对每个定义的不必要事件的风险反应。考虑以下风险反应类型:风险保留,降低风险,风险转移和风险消除。开发了三个参数风险矩阵,以便在实施风险反应后可以评估风险。实施风险管理的可能性与不需要的事件发生的可能性以及对项目结果的贡献成反比。介绍这种风险管理策略允许大大降低创新建设项目的风险。事实证明,成为将风险降低到可接受的水平的有效工具。在假定的时间,预算和质量标准中执行项目具有重要贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号