首页> 外文会议>SPE/IATMI Asia Pacific Oil Gas Conference and Exhibition >Target Cost Setting Model for Indonesian PSC amid Low Oil Price
【24h】

Target Cost Setting Model for Indonesian PSC amid Low Oil Price

机译:INDONESIAN PSC的目标成本设定模型在低油价下

获取原文

摘要

Target Cost Setting (TCS) objective is set up for required capital and operating cost for development of products at desired profit margin (Cooper, 2001). Dropping oil price recently which predicted longer (Bloomberg, 2016) will lead to a shortage in production by year 2035 (Woodmac, 2016). The various concepts for oil and gas development have to be analyzed in order to sustain the growth of production while maintaining an economic threshold limit during this low oil price period. The preferred concept development shall be achievable by doing reverse engineering (top down estimate) at the early stages of oil and gas life cycle. The driving idea behind this method is expediting the project framing and front end engineering process as well as maintaining continuous exploration and development within limited budget by allowing some "low hanging fruit" projects, while still obtaining the desired profit margin. The TCS model is working in the existing fiscal arrangement for any particular field and subsurface definition. The TCS simulations are performed by using available tools for cost estimation and economic models.
机译:目标成本设定(TCS)目标是为所需资金和运营成本为所需利润率开发(Cooper,2001)。最近滴油价预测(Bloomberg,2016年)将在2035年(Woodmac,2016)的生产中产生短缺。必须分析石油和天然气开发的各种概念,以便在这种低油价期间维持经济阈值限制的同时维持生产的增长。优选的概念开发将通过在石油和天然气生命周期的早期阶段进行逆向工程(上下估计)来实现。这种方法背后的驾驶理念正在加快项目框架和前端工程过程,并通过允许一些“低悬垂的水果”项目来维持有限预算中的连续探索和开发,同时仍然获得所需的利润率。 TCS模型正在为任何特定字段和地下定义工作的现有财务安排。通过使用可用的工具进行成本估算和经济模型来执行TCS仿真。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号