首页> 外文会议>Hydrovision International >Saxo turbine projects 11~e Chute HPP and Yellow Falls HPP
【24h】

Saxo turbine projects 11~e Chute HPP and Yellow Falls HPP

机译:SAXO涡轮工程11〜E CHUTE HPP和黄色瀑布HPP

获取原文

摘要

With over 40 commissioned units over the previous two decades, the double-regulated vertical axial water turbine, known as a Saxo turbine, has become well recognized product of Litostroj Power. Its compact design, wide operation range, high efficiency, simplified civil construction works, robustness, versatility, flexible operation, fully automatic and remote control, and easy maintenance made the turbine popular. The paper first presents general features of the Saxo “compact design philosophy” where transport, erection sequence, site installation works, delivery milestones and equipment costs are the main focus. The second part of the paper presents a true case study of two of the largest (by runner diameter) compact Saxo hydro-electrical projects where delivery time of approximately 20 months was achieved. Turbines were designed, delivered, installed and successfully commissioned on 11~e Chute and Yellow Falls hydro power projects with installed maximum capacity of 2 × 9.9 MW and 2 × 8.5 MW, respectively.
机译:在过去二十年中,拥有40多个委托单位,称为Saxo涡轮机的双调节垂直轴向水涡轮机已成为Litostroj电源的公认产品。其紧凑的设计,操作范围广,效率高,防护性能简化,鲁棒性,多功能性,灵活的操作,全自动和遥控,易于维护,使涡轮机流行。本文首先介绍了萨克索“紧凑设计理念”的一般特征,其中运输,安装序列,站点安装工程,交付里程碑和设备成本是主要的重点。本文的第二部分呈现了对最大的两个(通过跑步者直径)紧凑型SAXO水电项目的真实案例研究,其中达到了大约20个月的交货时间。在11〜E滑槽和黄色瀑布水电项目上设计,交付,安装并成功设计,配备了最大容量为2×9.9 MW和2×8.5 MW的最大容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号