首页> 外文会议>Hydrovision International >Quantification of Optimization Benefits from Detailed Unit Performance Testing at Multiunit Hydropower Facilities (PPT)
【24h】

Quantification of Optimization Benefits from Detailed Unit Performance Testing at Multiunit Hydropower Facilities (PPT)

机译:多单水电设施详细单位性能测试的优化优势量化(PPT)

获取原文

摘要

Operators of hydro plants typically assume that nominally identical units have identical performance characteristics. However, multiple factors can influence a unit’s performance. Differences in construction of intakes, penstocks, spiral cases, stay vanes, wicket gates, throat rings, and draft tubes can lead to performance differences among units. Turbine fabrication errors, different operational patterns, and different maintenance experiences, such as cavitation repairs, impact the performance of nominally identical units. Also, unit performance results are often obtained at a few heads and scaled across the full head range, leading to potential errors. The U. S. Bureau of Reclamation’s (USBR’s) Flaming Gorge Plant was selected for the initial case study of a research project to evaluate and quantify potential optimization benefits from detailed unit performance testing and optimized dispatch at USBR hydropower facilities. USBR personnel conducted efficiency tests for Flaming Gorge Units 1, 2, and 3 in November 2015.
机译:水力发电机的操作员通常假设名义上相同的单元具有相同的性能特征。但是,多种因素可以影响单位的性能。摄入量,钢板,螺旋形箱,留在叶片,检票口,喉咙环和拔出管道的差异可以导致单位之间的性能差异。涡轮机制造误差,不同的操作模式和不同的维护经验,如空化修复,影响名义上相同的单位的性能。此外,单位性能结果通常在几个头部获得并缩小整个头部范围,导致潜在的错误。美国垦区(USBR的)燃烧峡谷厂的美国委员会被选为研究项目的初步案例研究,以评估和量化来自USBR水电设施的详细单位性能测试和优化派遣的潜在优化效益。 USBR人员对2015年11月的火烈鸟峡谷单位1,2和3进行了效率测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号