首页> 美国政府科技报告 >Correlation of Concrete Tie Track Performance in Revenue Service and at the Facility for Accelerated Servic Testing. Volume 1. A Detailed Summary
【24h】

Correlation of Concrete Tie Track Performance in Revenue Service and at the Facility for Accelerated Servic Testing. Volume 1. A Detailed Summary

机译:收益服务和加速服务检测设施中混凝土领带绩效的相关性。第1卷。详细摘要

获取原文

摘要

This report is the first of three volumes which describe a comparative study of concrete tie track in U.S. revenue service and at the Facility for Accelerated Service Testing (FAST). The work was undertaken to develop an understanding of the degree to which FAST represents the 'real world' of revenue service. The loading environment, structural characteristics and long-term performance of concrete tie track at FAST were compared with corresponding data from four concrete tie track segments in revenue service.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号