首页> 外文会议>Transbaltica: Transportation Science and Technology Conference >Railway Rolling Stock Compressors Capacity and Main Reservoirs Volume Calculation Methods
【24h】

Railway Rolling Stock Compressors Capacity and Main Reservoirs Volume Calculation Methods

机译:铁路滚动股票压缩机容量和主储层体积计算方法

获取原文

摘要

Existing railway rolling stock compressors capacity and main reservoirs volume calculations methods were created in 1960-1970 and do not take into account the achievements of modern railway pneumatic technologies and the results of calculations of compressor capacity and main reservoir volume is inaccurate. The new calculation technology begins from total compressed air consumption for braking processes, air leaks and auxiliary needs definition. Knowing all compressed air consumption possibilities, compressor capacity is calculated. Then it is possible to calculate compressed air production system main reservoirs volume. Calculated compressor capacity and main reservoirs volume should be equal to air consumption for train brakes release and charge after service or emergency braking, for this purpose balance equation between produced and charged air is used. If railway rolling stock is operated in high humidity conditions without composed air dehumidification system main reservoirs useful volume decreasing. For that specific climate conditions compressor capacity should be corrected.
机译:现有的铁路滚动股票压缩机容量和主储层体积计算方法于1960年至1970年创建,并没有考虑到现代铁路气动技术的成就,压缩机容量和主储存量的计算结果不准确。新的计算技术从总压缩空气消耗开始,用于制动过程,空气泄漏和辅助需求定义。了解所有压缩空气消耗可能性,计算压缩机容量。然后可以计算压缩空气生产系统主储存系统。计算的压缩机容量和主储存器容量应等于火车制动器的空气消耗,以便在服务或紧急制动后充电,因为使用了所生产和带电之间的平衡方程。如果铁路滚动股票在高湿度条件下运行而无需组成空气除湿系统,则主储层的有用量减少。对于这种特定的气候条件,应纠正压缩机能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号