Construction and operation of high capacity longwall project: Adriyala experience

机译:高容量的建设与运营Longwall项目:Adriyala体验

获取原文

摘要

In India, lot of coal reserves exist up to 300m depth, are more amenable for extraction by opencast mining. Bulk production is possible with Opencast mining, with low gestation period, more safety and high percentage of extraction compared to underground methods. Hence coal operators are inclined towards opencast mining methods. India is the third largest coal producer in the world and is producing nearly 89% of coal from opencast mining and 11% from underground mining (2014-15)[1]. In India, the gap between the demand and indigenous availability of coal has been rising. Presently, coal imports are about 99 Million tonnes. The import requirement is projected to be 265 Mt by 2016-17. This gap is likely to widen further beyond XII Plan period leading to requirement of hefty imports. This unacceptable gap can be limited only by an all out effort by domestic coal producers [1]. With depletion of shallow reserves, the future emphasis has to be on faster exploration and underground mining. This calls for meticulous identification of coal blocks suitable for high mechanisation and introduction of state-of-the-art technology from overseas, in addition to possible semi mechanisation of the existing mines. Large scale mechanisation shall be sustained by expanding the service base of Equipment manufactures with supplementation of indigenous spares and parts manufacturing in line with 'Make in India policy'. These high capital intensive systems will not be viable unless global operating standards are achieved in equipment maintenance and utilisation. This demands highly skilled and motivated work force. Suitable planning and systems are to be developed for skill development and for adopting best management practices However, as shallow seated seams are exhausting at rapid pace and to meet the future requirement there is an urgent need for development and implementation of bulk production technologies for deep-seated deposits in the depth range of 300m to 600m by underground methods. Coal production at higher rates from underground, particularly at depths more than 300m, is possible with "Longwall Mining Technology", which is a proven technology worldwide[1]. Accordingly, one high capacity longwall project with an annual capacity of 2.817 MTPA has been commissioned with state of art equipment at Adriyala Longwall Project (ALP). After seeing the performance of Adriyala Longwall Project, SCCL is planning to introduce few more longwalls in near future. This paper brings out the constructional and operational experiences of high capacity longwall at Adriyala Longwall Project, SCCL.
机译:在印度,大量煤炭储量最大300米,更适合露趾采矿。与地下方法相比,Opencast矿业可能与露天矿物挖掘,具有较低的妊娠期,更高的提取率,更高的提取。因此,煤炭运营商倾向于露天采矿方法。印度是世界第三大煤炭生产国,并从露天采矿和地下采矿(2014-15)的11%的煤炭生产近89%的煤炭[1]。在印度,煤炭需求与土着可用性之间的差距一直在上升。目前,煤炭进口量约为9900万吨。进口要求预计到2016 - 17年的265亿吨。这种差距可能会扩大XII计划期限,导致对赫细进口的要求。这种不可接受的差距可以仅限于国内煤炭生产商的全外努力[1]。随着浅层储备的耗尽,未来的重点必须更快地探索和地下采矿。除了现有矿山可能的半机械化之外,这呼吁适用于高机械化的煤炭块,并从海外引入最先进的技术。通过扩大设备制造业的服务基地,通过补充土着备件和“印度政策”的零件制造,应持续大规模机械化。除非在设备维护和利用中实现全球操作标准,否则这些高资本密集型系统将不可行。这要求高技能和动力的劳动力。适用于技能发展的合适的规划和系统,用于采用最佳的管理实践,因为浅坐式接缝以快速速度耗尽并满足未来的要求,迫切需要发展和实施深层生产技术的批量生产技术通过地下方法安装在300米至600米的深度范围内的沉积物。煤炭产量从地下的较高速度,特别是300米以上的深度,“Longwall采矿技术”是可能的,这是一个熟悉的技术[1]。因此,年产量为2.817 MTPA的一个高容量LongWall项目已被Adriyala Longwall项目(ALP)的艺术设备委托。看到Adriyala Longwall项目的表现后,Sccl计划在不久的将来介绍一些更长的长墙。本文提出了在Adriyala Longwall项目,SCCL的高容量Longwall建筑和运营体验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号