...
首页> 外文期刊>Journal of Mines, Metals & Fuels >Adriyala longwall project - a breakthrough in hibernating period of Indian longwall mining
【24h】

Adriyala longwall project - a breakthrough in hibernating period of Indian longwall mining

机译:Adriyala Longwall项目 - 印度Longwall采矿期休眠期的突破

获取原文
获取原文并翻译 | 示例
           

摘要

India s proclivity with mechanized longwall started in Moonidih Colliery in 1978. Subsequently 33 longwall faces were introduced with overseas collaboration. The longwall production peaked up to 2.3 Mt in the year 1996-97. But later it went a steep decline and by 2008 with only three or four longwalls were in operation. Then after the longwall technology went through a hibernating phase with only two operating longwalls were in 2013. The reasons for this down trend are the selection of under rated powered roof supports, strata management issues, spares management issues, lack of indigenous manufacturing facilities and less than adequate trained man power etc. [1,2]. The need to curb this undesirable trend was recognized by Singareni Collieries Company Limited (SCCL), India making attempt to introduce a high capacity longwall, gave Adriyala longwall project. The impetus for the construction of high-end longwall was to increase the share of underground coal production and to explore the deeper deposits with high productivity.This paper explores the construction, ongoing operations and the challenges faced at India's highest capacity longwall project. A brief review on various aspects in constructing the project right from the exploration stage to outbye belt laying and panel preparation is given followed by the operations in I and II longwall panels.
机译:印度的倾向于机械化的Longwall于1978年在Moonidih煤矿开始。随后,33个Longwall面孔被海外合作引入。 1996 - 97年,长墙生产最高达到2.3吨。但后来它急剧下降,到2008年,只有三四个长墙进行运作。然后在2013年只有两个运行的长墙进行冬眠阶段之后。这个下降趋势的原因是选择额定动力屋顶支持,地层管理问题,备受管理问题,缺乏土着制造设施和较少比足够的训练有素的男性力量等[1,2]。遏制这一不良趋势的必要性被单身煤炭公司有限公司(SCCL)确认,印度试图引进高容量的长墙,给予Adriyala Longwall项目。高端长墙建设的推动力是增加地下煤炭生产的份额,探讨了高生产率的深层沉积物。本文探讨了印度最高产能的施工,持续的运营和面临的挑战。对勘探阶段构建勘探阶段的各个方面的简要审查,后面给出了I和II长墙板的操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号