摘要

This paper presents the results of a comprehensive study conducted by CONSOL Energy, Marcellus Shale Coalition, and Pennsylvania Coal Association to evaluate the effects of longwall-induced subsurface deformations on the mechanical integrity of shale gas wells drilled over a longwall abutment pillar. The primary objective is to demonstrate that a properly constructed gas well in a standard longwall abut-ment pillar can maintain mechanical integrity during and after mining operations. A study site was selected over a southwestern Pennsylvania coal mine, which extracts 457-m-wide longwall faces under about 183 m of cover. Four test wells and four monitoring wells were drilled and installed over a 38-m by 84-m centers abutment pillar. In addition to the test wells and monitoring wells, surface subsidence mea-surements and underground coal pillar pressure measurements were conducted as the 457-m-wide long-wall panels on the south and north sides of the abutment pillar were mined by. To evaluate the resulting coal protection casing profile and lateral displacement, three separate 60-arm caliper surveys were con-ducted. This research represents a very important step and initiative to utilize the knowledge and science obtained from mining research to improve miner and public safety as well as the safety and health of the oil and gas industries.
机译:本文介绍了由CONSOL Energy,Marcellus页岩联盟和宾夕法尼亚州煤炭协会进行的一项综合研究的结果,以评估长壁引起的地下变形对在长壁基台上钻探的页岩气井机械完整性的影响。主要目的是证明在标准的长壁邻接桥墩中正确构造的气井在采矿作业期间和之后均可保持机械完整性。在宾夕法尼亚州西南部的一个煤矿上选择了一个研究地点,该煤矿在约183 m的覆盖层下提取了457米宽的长壁工作面。钻了四个测试井和四个监控井,并在38米x 84 m中心基台柱上安装了。除了测试井和监测井外,还通过对基台南侧和北侧457米宽的长壁板进行开采来进行地面沉降测量和地下煤层压力测量。为了评估所得的护煤套管轮廓和侧向位移,进行了三个单独的60臂卡尺测量。这项研究代表着非常重要的一步和举措,是利用从采矿研究中获得的知识和科学来改善矿工和公共安全以及石油和天然气工业的安全与健康。

著录项

  • 来源
    《矿业科学技术(英文版)》 |2017年第1期|115-120|共6页
  • 作者

    Daniel W.H. Su;

  • 作者单位

    National Institute for 0ccupational Safety and Health, Bruceton 15236, PA, USA;

  • 收录信息 中国科学引文数据库(CSCD);中国科技论文与引文数据库(CSTPCD);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:02:37
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号