首页> 外文会议>International Conference on Recent Advances in Rock Engineering >Pre-feasibility study of Dras - Suru link hydroelectric projects, Kargil District, Jammu Kashmir
【24h】

Pre-feasibility study of Dras - Suru link hydroelectric projects, Kargil District, Jammu Kashmir

机译:面前研究 - 自我链接水平项目,卡尔加尔区,Jammu&Kashmir

获取原文

摘要

The Jammu & Kashmir State Power Development Corporation (JKSPDC) is contemplating for construction of different run of the river schemes on Dras - Suru Rivers to harness the power potential of these rivers. The Pre-feasibility Stage geotechnical and geological investigation of three hydroelectric projects across the Dras and Suru Rivers were carried out. These proposed projects, named as Dras-Suru link HEP Stage-I, Dras-Suru link HEP Stage-II and Karkit Hydro Electric Project, are all run of the river schemes. The Dras-Suru link HEP Stage-I envisages construction of a low height dam near Dras Town across the Dras River downstream of the bridge connecting the road to Sanko with the Srinagar - Leh national highway and an underground powerhouse near Dongchik village. The length of the proposed HRT is 8 km. and the estimated power potential is 45 MW with 110 m head and 50 cumecs designed discharge. The Dras-Suru link HEP Stage-II envisages construction of a low height dam/barrage across Dras River upstream of Dandal village and an underground powerhouse at village Pheruna along Suru River. The length of the HRT is 9.36 km. and the estimated power potential of the project is 70 MW with 150 m head and 50 cumecs designed discharge. All the project components of these two projects are located within Dras Volcanic Formation comprising mainly basalt and andesite in association with geosynclinals sediments. The proposed Karkit Hydro Electric Project envisages construction of a dam 1 km downstream of the confluence of Dras and Shingo Rivers with an underground powerhouse near Harka Bahadur Memorial upstream of the confluence of Shingo and Suru Rivers. The length of the HRT is 11 km and the estimated power potential is 180 MW with 124 m head and 126 cumecs designed discharge. The project components of this project are located within Ladakh Granitoid Complex comprising heterogeneous rock association of granite, gabbro, basic dykes, meta-volcanics and meta-sediments. During the course of the Pre-feasibility geotechnical investigation, one new project site was identified and height of the dam in one project was suggested for enhancement based on the geotechnical considerations. This led to revision of aggregate power potential of these projects from 172 MW to 305 MW, i.e. an addition of considerable 133 MW power potential.
机译:在查谟和克什米尔邦电力开发公司(JKSPDC)正在考虑建设上德拉斯河方案的不同运行 - 里弗斯宿儒利用这些河流的发电潜力。跨越德拉斯和苏茹河3个水电工程预可行性研究阶段的岩土工程和地质勘察中进行。这些拟议项目,命名为德拉斯 - 苏茹链接HEP阶段-I,德拉斯,苏茹链接HEP阶段-II和Karkit水利电力项目,是江方案的所有运行。该德拉斯 - 苏茹链接HEP阶段,我设想近德拉斯镇高度低大坝横跨德拉斯河连接的道路三光与斯利那加桥下游的建筑 - 列城国道和附近的村庄Dongchik的地下厂房。所提出的HRT的长度为8公里。和估计的电源电势是45 MW与110米头和50个cumecs设计放电。该德拉斯 - 苏茹链接HEP阶段-II设想的低高度坝/堰坝横跨Dandal村和沿苏鲁河村Pheruna的地下厂房德拉斯河上游建设。在HRT的长度为9.36公里。和该项目的估计的功率电势为70兆瓦150米头和50个cumecs设计放电。这两个项目的所有项目组件都位于内德拉斯火山岩地层主要包括玄武岩和安山岩与geosynclinals沉积物关联。吾与苏茹河的汇合处的建议Karkit水利电力项目设想建造的近巴哈杜尔金牛座的纪念地下厂房德拉斯和吾河的汇合处下游的坝1公里上游。在HRT的长度为11公里,所估计的功率电势为180兆瓦124米头和126个cumecs设计放电。该项目的项目组件位于花岗岩,辉长岩,基本堤坝,间火山岩和元沉积物拉达克花岗岩络合物,其包含多相岩石组合内。在预可行性研究勘察的过程中,一个新的项目现场鉴定,并根据岩土考虑被建议用于增强在一个项目大坝的高度。这导致了这些项目的总发电潜力,从172兆瓦至305兆瓦,即加法相当的133兆瓦的发电潜力的修订。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号