Construction Techniques in Crossing Water-rich Sand Stratum of Deep Buried Large Tunnels

机译:深埋大隧道交叉水富水堆施工技术

获取原文

摘要

As a subdivision and backbone project of engineering of drawing water from Datong River into Huanshui River, the water transfer for main channel project is designed to transfer water from Datong River to Huangshui River, with the total amount of 3.6×108m~3 in a short-term and 7.5×108m~3 in a long-term. The project scale is large II. It is determined to be 2-level for main structure, 3-level for secondary structure and 4-level for temporary structure. The diversion tunnel, which is a non-pressure tunnel to draw water, is 24165.83m in length. The ground elevation of tunnel axis is 2943~4020m, the maximum and mean burial depths are 1100m and about 480m respectively, so that it is a deep and long tunnel, which is constructed with TBM, with 5m for diameter, 2955.6 and 2941.7 respectively for elevation of inlet floor and outlet floor. The designed flow of water diversion is 35m~3/s, longitudinal slope is i=0.00054529, and the maximum flow velocity within the tunnel is 2.24 m/s.
机译:作为乘坐大同河流进入华松河的楼层水的细分和骨干工程,主要渠道项目的水转转让旨在将水从大同河到黄水河的水,总金额为3.6×108m〜3 长期 - 7.5×108m〜3。 项目规模很大二。 确定主要结构的2级,二级结构的3级和4级的临时结构。 导流隧道,是一种用于抽水的非压力隧道,长度为24165.83米。 隧道轴的地面高度为2943〜4020米,最大和平均埋藏深度分别为1100米至约480米,使其是一个深层和长的隧道,其与TBM构造,分别为5米,2955.6和2941.7。 入口地板和出口地板的高度。 设计的分流流动为35m〜3 / s,纵向斜率为I = 0.00054529,隧道内的最大流速为2.24米/秒。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号