首页> 外文会议>International Seminar on Operational Excellence in Mining >Application of Discrete Event Simulation in Mine Development Planning
【24h】

Application of Discrete Event Simulation in Mine Development Planning

机译:离散事件仿真在矿山开发规划中的应用

获取原文

摘要

In block/panel caving mines, the start of production depends on the on-time execution of the various mine developments. A major problem in mine development is associated to the plan and execution of horizontal developments, due to the high number of active faces, resources and activities that needs to be scheduled simultaneously. Additionally, planning requires adding the diverse operational interferences that occurs during the process. This paper proposes that discrete event simulation methods can be used as an effective tool to quantify different mine development strategies and operational improvements to achieve mine excellence. Modeling and simulations considered the Esmeralda mine sector of El Teniente, where a database of the different tasks involved was previously collected in the field. Time of each unit operation and time of interferences were analyzed and included as variables for the simulation model. Calibration of the stochastic model was a 2.4 % error from the actual advance of horizontal developments at the mine. Once the calibration was performed, two scenarios were tested. The first considered an improvement on the management of interferences and the second an improvement in the excavation cycle using emulsion. A reduction on the interferences means an improvement to 35 % and the use of emulsions an improvement of 17 % in the advance of horizontal developments. The result shows that the use of the simulation technique could be useful for strategic mining development planning and a support tool for the decision making process of planners.
机译:在街区/面板崩落矿山中,生产的开始取决于各种矿井发展的准时执行。由于需要同时安排的有效面,资源和活动,矿山发展中的一个主要问题与水平发展的计划和执行有关。此外,规划需要添加在过程中发生的各种操作干扰。本文提出了离散事件仿真方法可用作量化不同矿山发展策略和运营改进的有效工具,以实现卓越的卓越。建模与仿真认为El Teniente的Esmeralda矿业部门,其中涉及的不同任务的数据库预先收集在该领域。分析每个单元操作和干扰时间的时间,并作为仿真模型的变量。随机模型的校准是矿井水平发展的实际前进的2.4%。一旦校准进行,测试了两种情况。第一次考虑了使用乳液的干扰管理和第二种改善的改善。干扰的减少意味着提高了35%,乳液的使用在水平发展的进展中提高了17%。结果表明,使用仿真技术对战略采矿开发规划和策划者决策过程的支持工具有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号